A primary school that opened just 10 years ago and has been plagued with severe roof problems could be demolished.
Tenby VC School, an English-medium primary for pupils aged three to 11, was built in 2016 but reports of water leaking into the building emerged a few years later.
A report ahead of Pembrokeshire council’s cabinet meeting on 30 November recommends moving the school permanently to nearby Ysgol Greenhill.
Under the plan, Tenby VC pupils would move into Ysgol Greenhill’s existing two-storey maths block, and the Tenby building would be demolished.
The report said £15.4m had been set aside to replace the roof in 2028-29 and the new plan would “mean that a significant saving will be made”.
It added that moving the pupils would provide “a single site solution” and “by far the best value for money”.
In November 2024, a £75,000 feasibility budget to look at ways of tackling the leaks was backed by the cabinet.
The council installed 510 steel supports under vulnerable roof areas, closed the early years/playgroup wing and carried out regular inspections to reduce immediate health and safety risks.
At its November 2025 meeting, the cabinet received a feasibility study that favoured replacing the entire roof, sending pupils to “other sites” and backed seeking tenders for the work.
But under this option, no-one would be allowed in the building while the work was being carried out, which would last until at least October 2029.
Members are recommended to back the new option, including the building demolition.
We used AI to help edit this article, and a BBC journalist checked it before publication. More on this AI pilot.
